The basis for the purchase of diesel generator sets

5. Automatic start checking the reliability of power supply and automatic shutdown
(1) then self-control or remote start command, diesel power generation should be able to start automatically.
The first 3 failures (2) The unit starts automatically, should send a signal to start to fail; when equipped with reserve units, procedures should be able to boot the system automatically starts the command is passed to the other standby unit.
(3) from the automatic start command is issued to the power to the load time should not exceed 3min
(4) diesel generators started automatically successful, first loading shall not be less than 50% of the calibration load.

(5) After receiving the stop command or remote-controlled, the crew should be able to automatically shut down; for the electricity grid and the use of the standby unit, when the power returns to normal, diesel generators should be able to automatically switch or automatically shut down, its stop mode delay Time should be consistent with product technical conditions.


diesel generator Gwalior diesel generator Guwahati diesel generator Gurgaon
diesel generator Guntur diesel generator Gulbarga diesel generator Hyderabad
diesel generator Hubli-Dharwad diesel generator Indore diesel generator Jaipur
diesel generator Jabalpur diesel generator Jalandhar diesel generator Jamshedpur
diesel generator Jamnagar diesel generator Jhansi diesel generator Jammu
diesel generator Kolkata diesel generator Kanpur diesel generator Kalyan-Dombivali
diesel generator Kochi diesel generator Lucknow diesel generator Ludhiana
diesel generator Loni diesel generator Greater Mumbai diesel generator Meerut
diesel generator Madurai diesel generator Moradabad diesel generator Mira-Bhayandar
diesel generator Nagpur diesel generator Nashik diesel generator Navi Mumbai

没有评论:

发表评论