24,
remote control, remote communication and telemetry performance
(1)
intelligent unit
200KW or
more units should be intelligent, that monitors content and interface
requirements are as follows:
① control: on / off, emergency stop, switch
the main standby unit.
② telesignalling: work status (run / stop),
operating mode (automatic / manual), mainly used units, overvoltage,
undervoltage, overcurrent, frequency
③ Telemetry: Three-phase output voltage,
three-phase output dynamic battery voltage, output power.
④ Interface: should have a communication
interface (RS-232 and RS-485/422) and can provide a complete communication
protocol.